Product and briefs 4 min read Updated

User stories and acceptance criteria

In short

Write each story around a person, a need and a goal, then check it against acceptance criteria before building starts.

A user wants to get something done in the service, and the brief often reads like a single sentence. A user story turns that sentence into work the team can build and test. What matters most is that the story names the person, what they need and why. The examples come from the GOV.UK Service Manual.

A need is broad, a story is narrow

A user need is high-level, broad and stable over time. It describes what the user must get from the service, not what the service should look like. A user story is narrower: it names one actor, one thing they need to do and the reason for it. Start from a need that research has supported, then write one or more stories that serve it.

The Service Manual gives the template “As a… [who is the user?]”, “I need/want/expect to… [what does the user want to do?]” and “So that… [why does the user want to do this?]”. You may use another format, but every story still has to state the actor, the need and the goal.

The goal decides when the story is done

The Service Manual says that the most important part of a user story is the goal. If you struggle to write it, the guidance suggests asking why the feature is needed. A goal that only restates the feature, such as “so that the feature works”, does not help the team decide when the story is done. The table shows the three parts with the example from the guidance.

PartQuestion it answersExample from the guidance
ActorWho is using the service?As a UK resident
NarrativeWhat do they need the service for?I want to get my details on the electoral register
GoalWhy do they need it?So that I can vote

Working on something similar in your own product? A few honest sentences are enough – we read every enquiry and reply by email. Apply with your idea

Split a large story until each part fits an iteration

The guidance calls a large story, one that would take more than a few weeks to develop and test, an epic. Split it into smaller stories that can each be completed within an iteration. Every smaller story keeps its own actor and goal, so that it can still be checked on its own. The guidance gives no other numeric size limit, so the team decides what fits in one iteration.

Write acceptance criteria as checks

Acceptance criteria are the outcomes the team uses as a checklist to confirm that the service has done its job. The Service Manual often writes them as a list that begins with “it’s done when…”. For the electoral register example, the guidance gives “it’s done when the user knows how to register online”. Link each criterion to any evidence, such as a spreadsheet or diagram, that supports the story. Each one must be something the team can confirm with a clear yes or no, not a general aim.

The guidance does not use the term definition of done. The closest it comes is the advice that the goal helps the team decide when a story is done and a user need is met.

Run every story through this checklist

  1. Name the actor, the narrative and the goal.
  2. Check that the goal explains why the feature is needed.
  3. Complete the story within one iteration, or split it.
  4. Write acceptance criteria that begin with “it’s done when…” and confirm that each one can be checked.
  5. Attach the evidence that supports the story.
  6. Agree with the team what done means for the story, in its own working agreement.

The format, the example and the acceptance criteria come from the GOV.UK Service Manual. The term definition of done is not used there; the working agreement in the last item is common practice.

Sources and limits

Stories depend on a clear product brief and on the release boundary set by deciding what to leave out of the first version. Once the stories are built, measuring whether a product works shows how to check that the outcome has actually changed.

Common questions

What must every user story name?
The actor, the narrative and the goal. The guidance allows a different format, but every story should still briefly explain these three parts.
When should a story be split?
When it would take more than a few weeks to develop and test, which the guidance calls an epic. Split it into smaller stories that can be completed within an iteration.
How does the team know a story is done?
Through acceptance criteria, which are often written as a list beginning “it’s done when…”. The guidance does not use the term definition of done, but says the goal helps the team decide when a story is done.

Sources

  1. Writing user stories - Service Manual - GOV.UK, GOV.UK Service Manual. Accessed 24 November 2026
  2. Learning about users and their needs - Service Manual - GOV.UK, GOV.UK Service Manual. Accessed 24 November 2026

Further reading

  • Writing a one-page product brief

    A one-page product brief names the problem, the user, the outcome, the constraints and the non-goals, and leaves features out until the need is agreed.

  • What to cut from a first version

    Cut everything that does not help the first release answer its one question, then sort what is left into must, should and won’t.

  • Measuring whether a product works

    Track three or four measures tied to what the product is for, record a baseline before you change anything, and read the numbers in context.

Have an idea that should exist? Or a working product that needs more customers, a new website or a complete rework? Bring us anything. Apply with your idea

All notes