What to cut from a first version
In short
Cut everything that does not help the first release answer its one question, then sort what is left into must, should and won’t.
A first release has to answer one question, or it is unclear what happens next. It does not need to be a smaller copy of the finished service. The GOV.UK Service Manual explains how the alpha and beta phases set the purpose of each release, and the remaining work is then sorted into must, should and won’t.
Start with one question
The alpha phase is where teams try out solutions to the problems found during discovery. The Service Manual tells teams to test the riskiest assumptions rather than prototype everything. You do not need to prototype the whole user journey, or even all of one transaction. Build only what is needed to test different ideas.
The first question for any release is therefore simple: which assumption must this version test? If the answer is a long list, split the release.
Each phase asks a different question
Alpha services should not be available for the public to use, and their code is temporary. The guidance expects teams to discard much of that code, and many of the ideas, at the end of alpha. Alphas tend to last between 6 and 8 weeks. The decision to move on is based on the success metrics agreed at the end of discovery.
Beta starts when the best idea from alpha is built for real. It has two stages: a private beta, which begins by inviting a limited number of people, and a public beta, which needs a beta assessment first. The table summarises the difference.
| Phase | Main question | Who can use it | Code |
|---|---|---|---|
| Alpha | Is this solution worth taking forward? | Testers, not the public | Prototype, expected to be discarded |
| Private beta | Does the chosen solution work for real users? | A limited number of invited people | Built for real users, still being refined |
| Public beta | Can the team run the service at scale? | Anyone, after the beta assessment | Refined service, tested at scale |
Sort the work into must, should and won’t
The GOV.UK beta guidance asks teams to keep testing and refining scope during beta. It does not give a prioritisation method, so the labels below come from common practice rather than from the guidance.
- Must items are the ones without which the release cannot answer its question.
- Should items make the test more useful, but the test still works without them.
- Won’t items are named and parked. Writing them down stops them returning in the middle of the build.
Keep the list short. A first release with a long list of must items is usually a full product in disguise.
Working on something similar in your own product? A few honest sentences are enough – we read every enquiry and reply by email. Apply with your idea
Link every item to an assumption
Each must item should trace back to the assumption the release tests. If you cannot name that assumption, the item is probably a should. A few examples show how this works in practice:
- A payment step is a must only if the test is about whether people will pay. If the test is about whether people want the product, a simple request for an offer may be enough.
- An account login is usually a should or a won’t, because the first test rarely depends on it.
- A reporting screen for staff can wait for the second release unless the test measures staff effort.
These are examples of reasoning, not findings from research.
Plan for stopping before you start
The alpha guidance says that if the team is not confident it can meet user needs cost-effectively, it can stop altogether, or repeat discovery or alpha. That option only works if it was agreed in advance. Before alpha begins, write down which result would mean continue, which would mean repeat, and which would mean stop. The discovery guidance does not treat stopping as a failure either: it is acceptable when research shows it is the best choice.
A checklist for the first version
Before the build starts, check the release plan against these points:
- Write down one question, together with the assumption it tests.
- Check that every must item traces back to that question.
- List the won’t items, so they can be pointed to later.
- Confirm that the release can be tested without a public launch.
- Agree with the team which result means continue, repeat or stop.
Phase purposes and quotations come from the GOV.UK Service Manual. The table summary, the must, should and won’t labels and the checklist are the studio’s own practical framing.
If the assumptions are still unclear, start with the one-page product brief. Different prototype types suit different questions, and how private and public beta differ explains who gets access next.
Common questions
- Where should a first release start?
- With the riskiest assumption. The alpha guidance says to test the riskiest assumptions rather than prototype everything, and you do not need to prototype the whole user journey, or even all of one transaction.
- Can the public use an alpha service?
- No. The GOV.UK guidance says alpha services should not be available for the public to use, and prototype code is not meant to be production-grade.
- What decides whether a team moves from alpha to beta?
- Whether the prototype is substantial enough to decide, using the success metrics set at the end of discovery, and whether the team can meet user needs cost-effectively with the budget and people to deliver. If not, the team can stop, or repeat discovery or alpha.
Sources
- How the discovery phase works - Service Manual - GOV.UK, GOV.UK Service Manual. Accessed 24 November 2026
- How the alpha phase works - Service Manual - GOV.UK, GOV.UK Service Manual. Accessed 24 November 2026
- How the beta phase works - Service Manual - GOV.UK, GOV.UK Service Manual. Accessed 24 November 2026
Further reading
-
What each kind of prototype can and cannot tell you
Pick the cheapest kind and fidelity that answers your riskiest assumption, and throw the prototype code away at the end of alpha.
-
Private beta, public beta and live
Private beta invites a limited group, public beta opens the service to anyone who needs it, and live starts after the live assessment at the end of public beta.
-
Mobile app vs. responsive web and PWA: how to choose
Most early products ship faster as a responsive web app or PWA: one codebase, instant releases and no app store review gate. Build a native mobile app only when hardware, offline storage or background execution genuinely require it.
Have an idea that should exist? Or a working product that needs more customers, a new website or a complete rework? Bring us anything. Apply with your idea